Skip page header and navigation
Skip to search or filter results
Skip sidebar content

Blog posts

News

  1. Blog category
    •  Case Studies

    Blossom

    19 September 2023

    Telcom Preconnect™ case study
    Social media agency Blossom need lots of bandwidth for shooting and sharing content

    Blossom video image
  2. Blog category
    •  Case Studies

    Trafford Palazzo

    7 September 2023

    Telcom Preconnect® case study
    Overcoming connectivity challenges at Trafford Palazzo for Peel Land and Property

    Trafford Palazzo Video
  3. Blog category
    •  Case Studies

    Metrotech

    7 September 2023

    Telcom Wholesale case study
    Helping Metrotech meet critical delivery timescales

    Metrotech Video thumbnail
  4. The job that sticks out is a job we did in Spinningfields putting in a fibre link: I have never experienced such torrential rain like on that day. Morale was low but we managed to work as a team and get the job in regardless. At the end, everyone was soaking wet, but we managed to complete a very challenging installation and overcome a turbulent night working together as a team. It was a testing day, but it got us closer as a team.

    James Braden
  5. After leaving the Armed forces, after serving fourteen years, I served three years employed by Metronet (now M247) before moving to Telcom last year. After leaving the Armed forces I was contacted by a close friend (Lee Lawrence - then operations director of M247) who offered me a role within the engineering department at Metronet (now M247).

    Telcom Vans